The demolition of an existing structure is often a critical step that must be completed before new construction is underway. Demolition project sizes vary, and there are several important preparation steps that must be completed prior to the onset of a demolition project.
The Demolition Types
A commercial demolition project manager will contract a job and perform an inspection of an existing structure. A property owner can decide to have a building removed in its entirety or can choose to have some parts of a building demolished. A building's aesthetical and historical value should be taken into account, before deciding upon the complexity of a demolition project. If the exterior or interior building components that make up a structure are in good shape, a property owner may decide to salvage some or all of the materials.
A demolition team can target which parts of a building are demolished. For instance, if the interior of a building is going to be totally revamped but the exterior structure is going to remain intact, a demolition team will gut the building. This will involve tearing down walls and other internal structures. The entire outside of a building will remain untouched.
A demolition project may also involve deconstructing some or all of a structure. If a new building is going to utilize some of the materials but will possess a totally different layout than an existing structure, a demolition team may remove materials piece-by-piece. The materials can be repurposed during the construction of a new building.
The Preparation Steps
A commercial demolition project will require a property owner to acquire the proper permits for the zone that the building is located in. A complete inspection will need to be performed. This inspection will ensure that there are no hazards that could prevent a demolition team from completing their job duties. If asbestos, mold, or another substance that is harmful is present, mitigation efforts will be conducted first.
After the building is deemed safe, the demolition project can commence. A building that is unoccupied may contain furnishings and other loose items that can be salvaged. A property owner should perform an assessment of the interior and should make plans to remove any items that they wish to salvage. A demolition team will have a safety crew on board who will oversee the demolition project. Many types of machinery may be used to demolish an existing building. After the project is complete, cleanup efforts will begin.